Plumbingjobs.com Logo
How to bid a plumbing job

How to Bid Plumbing Jobs (and Win More Work)

Bidding a plumbing job accurately is as much an art as it is a science. Whether you’re a new plumber just starting out or an experienced contractor looking to refine your process, mastering how to bid a plumbing job can improve profitability, reduce misunderstandings, and help you win more contracts. In this guide, we’ll walk through every step of the bidding process—from gathering project details to calculating labor, materials, overhead, and profit—so you can submit clear, competitive, and professional plumbing estimates that resonate with clients in any market.

Accurate bids set the foundation for a successful plumbing project. Underestimate costs, and you risk losing money; overestimate, and you may lose the job to a competitor. Learning how to bid a plumbing job properly not only boosts your bottom line but also earns trust with clients and general contractors. In this article, you’ll discover a step-by-step approach, practical tips, real-world examples, and local considerations—so you’re fully equipped to craft winning plumbing estimates. Ready to sharpen your bidding skills? Let’s dive in.

Why a Detailed Plumbing Bid Matters

  • Builds Trust: A transparent, itemized estimate shows clients you’re thorough and honest.
  • Minimizes Disputes: Clearly defined costs and scopes reduce misunderstandings once work begins.
  • Maximizes Profit: Accurately accounting for labor, materials, overhead, and contingencies ensures you don’t leave money on the table.
  • Enhances Professionalism: A polished bid sets you apart from competitors who deliver hand-scribbled or generic quotes.

Step-by-Step Plumbing Bid Process

Below is a comprehensive breakdown of each phase in your bidding workflow. Use these steps as a checklist to ensure nothing falls through the cracks.

  1. Gather Project Information
  2. Perform a Site Visit (if possible)
  3. List Required Materials
  4. Calculate Labor Costs
  5. Add Overhead and Profit
  6. Include Permits, Inspections, and Contingencies
  7. Compile the Final Estimate
  8. Review and Present the Bid

We’ll explore each step in detail.

1. Gather Project Information

Before diving into numbers, collect all available documents and details:

  • Scope of Work: Understand exactly what the client wants—new installation, repair, remodel, or emergency service.
  • Blueprints or Plans: For larger jobs (e.g., new home plumbing or commercial retrofit), review architectural or mechanical drawings.
  • Client Expectations: Clarify finish levels (standard vs. high-end fixtures), timeline, and any special requests (e.g., green plumbing options).
  • Site Accessibility: Note if the job site is easy to access or if there are challenges like narrow hallways, multi-story buildings, or remote locations.
  • Existing Conditions: Determine if existing piping is copper, PVC, PEX, or cast iron; older systems may need extra labor to modify or remove.

Pro Tip: Whenever possible, ask the client or general contractor for detailed information upfront. The more you know, the more accurate your bid will be.

2. Perform a Site Visit (If Possible)

Even when clients provide photos or videos, an in-person or virtual site visit can uncover hidden complexities:

  • Verify Measurements: Confirm lengths of pipe runs, wall orientations, ceiling heights, etc.
  • Inspect Existing Infrastructure: Check for rusted fittings, corroded pipes, or code violations that might require additional work.
  • Discuss Potential Obstacles: Look for obstructions—structural beams, electrical conduits, or confined crawlspaces—that could slow down the job.
  • Identify Safety Concerns: Note if asbestos, lead pipes, or other hazardous materials are present—these can dramatically affect cost.

Example: You’re bidding on installing a new water heater. A quick look at the mechanical room might reveal limited clearance, requiring a “hairpin” installation with flex connectors—this adds time and materials.

3. List Required Materials

Once you have project details, create a detailed inventory of everything you’ll need. Break materials into categories:

  1. Rough-in Materials
    • Pipes: lengths of copper, PEX, or PVC (list diameters: ½″, ¾″, 1″, etc.)
    • Fittings: elbows, tees, couplings, adapters, unions
    • Valves: gate, ball, check, backflow preventers
    • Supports: pipe hangers, straps, brackets
  2. Finish Materials
    • Fixtures: sinks, toilets, faucets, showerheads, tubs
    • Trim and Hardware: escutcheons, escutcheon plates, decorative valves
    • Water Heaters: tank-type or tankless, brand/model specifics
  3. Consumables and Miscellaneous
    • Sealants: pipe dope, Teflon tape, thread sealant
    • Solder Supplies: flux, solder, torch fuel
    • Fasteners: screws, anchors, staples for PEX
    • Protective Materials: drop cloths, protective gear

Tip: Use industry-standard catalogs or software (e.g., MEP design systems, Supplier price lists) to pull accurate material costs. If you maintain a materials database, ensure it’s up to date for your local market.

4. Calculate Labor Costs

Labor often makes up 40–60% of a plumbing bid. Here’s how to break it down:

a. Estimate Man-Hours

  • Diagnose Each Task: For example, “Installing a new sink” may involve 1 hour to tear out the old sink, 2 hours to prep drain and water lines, and 1 hour to install and test.
  • Account for Crew Size: If two plumbers are needed for shoulder-to-shoulder work (e.g., moving heavy boiler units), double the man-hours.
  • Factor in Travel/Setup: Include time for driving to the job site, setting up tools, and cleanup. A standard rule of thumb: add 15–20% of man-hours for non-productive time.

b. Determine Hourly Rates

  • Journeyman vs. Apprentice: Journeymen command higher hourly wages (e.g., $40–$60/hour in many U.S. markets), while apprentices might be $20–$30/hour.
  • Overtime and Premium Rates: For after-hours, weekend, or emergency calls, define overtime multipliers (1.5× or 2× regular rate).

Example Calculation:

  • Task: Replace a main shut-off valve in a residential basement
  • Plumber A (Journeyman) – 2 hours @ $50/hr = $100
  • Plumber B (Apprentice) – 2 hours @ $25/hr = $50
  • Travel & Setup Time – 0.5 hour @ $50/hr = $25
  • Total Labor = $175

Note: Many contractors add a small buffer—such as 5–10%—for unforeseen complications like stuck fittings or hidden leaks.

5. Add Overhead and Profit

A healthy plumbing business needs to cover more than direct labor/materials. Overhead and profit help ensure longevity.

a. Calculate Overhead

Overhead includes rent, insurance, utilities, tool maintenance, licenses, office staff, marketing, and vehicles. A typical formula:

  1. Annual Overhead Cost /
  2. Billable Labor Hours =
  3. Overhead Rate per Hour
  • Example:
    • Annual Overhead = $120,000 (office rent, salaries, insurance, licenses)
    • Billable Labor Hours = 3,000 (two plumbers working 1,500 hours each)
    • Overhead Rate = $120,000 / 3,000 = $40/hour

Your bid should allocate overhead to each man-hour: if your plumber works 10 hours on a job, allocate $400 of overhead.

b. Determine Profit Margin

Profit margin varies by market and job complexity. Typical plumbing profit margins range from 10–30%. Consider:

  • Residential vs. Commercial: Commercial jobs often require higher margins due to stricter codes and bonding requirements.
  • Market Competition: In a saturated market (e.g., urban California), margins may tighten; in rural Texas, you may command a higher margin due to less competition.
  • Scope Uncertainty: If the bid has many unknowns (e.g., hidden corroded pipes), aim for the higher end of profit margin to buffer risk.

Example:

  • Direct Costs (Labor + Materials + Permits) = $2,000
  • Overhead Allocation (10 man-hours × $40/hr) = $400
  • Subtotal = $2,400
  • Profit (15%) = $360
  • Total = $2,760

6. Include Permits, Inspections, and Contingencies

a. Permits and Inspection Fees

  • Know Local Requirements: Each city or county has different plumbing permit fees. For instance, Los Angeles County might charge $250–$500 per permit, whereas a small Texas town may be $50–$100.
  • Allow for Multiple Permits: If the job involves gas piping, backflow prevention, or remodeling, you may need separate permits.
  • Add Inspection Trips: Include the time and cost for driving to the municipal building or having inspectors visit the site—often 1–2 hours of labor plus any parking fees.

b. Contingency Allowance

Always budget for unexpected issues. Standard practice is to add a 5–10% contingency on the materials and labor subtotal. This handles surprises like:

  • Hidden joists blocking pipe runs
  • Improper venting discovered during rough-in
  • Corroded drain lines requiring partial re-piping

Tip: Clearly state in your bid that contingency funds are held for “unknown conditions” and will only be used with client approval.

7. Compile the Final Estimate

Now that you have each component—materials, labor, overhead, profit, permits, and contingency—assemble a professional, itemized estimate:

  1. Cover Page
    • Company name, logo, contact information
    • Client name, project address, and bid date
    • Job description summary (“Replace 50 ft of copper water service line and install new water heater”)
  2. Scope of Work
    • Bullet points or short paragraphs detailing specific tasks (e.g., “Remove existing 40-gallon water heater and dispose,” “Install new 50-gallon tankless water heater,” “Re-route ¾″ copper supply line from basement to attic”).
    • Any exclusions (e.g., “Does not include drywall patching or painting”).
  3. Itemized Cost Breakdown
    • Materials: List each item, quantity, unit cost, and total cost.
    • Labor: List labor categories (journeyman, apprentice), man-hours, hourly rates, and subtotals.
    • Overhead Allocation: Clearly note how overhead is applied (e.g., $40/hour × 10 hours).
    • Permits & Inspections: Permit fee + 2 inspection trips ($50 each).
    • Contingency: 7.5% of combined materials and labor.
    • Profit: 15% of subtotal (materials + labor + overhead + permits + contingency).
  4. Grand Total
    • Sum of all line items with tax breakdown (if applicable).
    • Payment terms (e.g., 30% deposit, balance upon completion, net 15 days).
    • Validity period (“This bid is valid for 30 days.”).
  5. Terms & Conditions
    • Payment schedule, warranty details, change order process, and sales tax information.

Visual Note: Consider including a simple pricing table or chart showing “Material Costs vs. Labor Costs” to help clients visualize how the total comes together.

8. Review and Present the Bid

Before sending your bid to the client:

  • Double-Check Numbers: One misplaced decimal can turn a $2,760 job into $27,600.
  • Verify Scope Match: Ensure everything the client asked for is covered, and nothing extra is accidentally added.
  • Spell Out Exclusions: Avoid disputes by listing what’s not included (e.g., “Does not include landscape repairs after trenching”).
  • Polish Presentation: Use your company’s branded template (with logo and consistent fonts). A clean, professional look instills confidence.

Pro Tip: Whenever feasible, meet the client in person or schedule a video call to walk them through your bid. This dialogue allows you to explain line items, answer questions, and showcase your expertise—dramatically increasing your chance of winning the job.

Deep Dive—Key Bid Components Explained

Below, we unpack critical bid components in more detail to help you fine-tune each section of your estimate.

Calculating Material Costs

Sourcing Accurate Material Prices

  • Local Supplier Quotes: Prices can vary significantly between suppliers. Always call around or use online portals to get current prices for copper, PEX, fixtures, and specialized parts.
  • Bulk Discounts: If your bid involves large quantities (e.g., a 30-unit apartment complex), negotiate bulk pricing or contractor discounts.
  • Delivery Fees: Some suppliers charge for delivery—include those fees or note “pickup only” if you plan to transport materials yourself.

Accounting for Waste and Scrap

  • Cutting Loss Allowance: Add 5–10% extra pipe and fittings to account for cutting scraps, mistakes, or hidden rot.
  • Fixture Breakage: When ordering delicate items like ceramic sinks or brass fixtures, budget for a small percentage (1–2%) that might arrive damaged.

Example:

  • Copper Pipe (½″): 100 ft @ $1.50/ft = $150
  • Copper Fittings (Elbows, Tees): 25 units @ $3/ea = $75
  • Waste Allowance (10%): $22.50
  • Total Rough-In Pipes & Fittings = $247.50

Calculating Labor Costs

Breaking Down Labor Tasks

  • Rough-In Phase: Cutting and joining main supply lines and drain-waste-vent (DWV). Use a “mile per minute” rule: a skilled plumber can cut and braze 10 ft of copper per 10 minutes—adjust based on complexity.
  • Trim/Finish Phase: Installing fixtures, adjusting valves, and running water tests. This phase often proceeds faster but demands attention to fine details.
  • Testing & Commissioning: Pressure testing supply lines at 80 psi for 15 minutes, inspecting for leaks, and verifying drain slope. Usually 1–2 hours depending on system size.

Multipliers for Job Type

  • Residential vs. Commercial: Commercial jobs often require more rigorous inspections, larger pipe sizes, and coordination with other trades—add a 1.2× multiplier on labor.
  • Emergency or After-Hours: If the client needs a midnight or weekend call-out, apply premium rates (1.5× to 2×) or set a minimum call-out fee (e.g., $200 minimum).

Scenario Example: Quoting for a 2-bathroom home re-pipe:

  • Rough-In PEX Installation: 20 hours (journeyman @ $50/hr + apprentice @ $25/hr)
  • Trim & Fixture Installation: 8 hours (journeyman @ $50/hr)
  • Testing/Commissioning: 2 hours (journeyman @ $50/hr)
  • Travel/Setup: 2 hours combined
  • Total Man-Hours = 32
  • Labor Cost = (20 × (($50 + $25)/2)) + (8 × $50) + (2 × $50) + (2 × (($50 + $25)/2))
  • Labor Cost = (20 × $37.50) + (8 × $50) + (2 × $50) + (2 × $37.50) = $750 + $400 + $100 + $75 = $1,325

Overhead, Profit, and Markup

Distinguishing Between Markup and Margin

  • Markup is the percentage added to your cost to arrive at a selling price.
  • Margin is the percentage of the final price that represents profit.

Example:

  • Cost of materials: $500
  • Desired markup: 50% → Sell materials at $750
  • Profit margin on materials = ($750 − $500) / $750 = 33%

When totaling the bid, clearly show both the markup on materials (if you supply them) and your overall margin after including labor and overhead.

Setting Realistic Profit Targets

  • Small Residential Jobs: 15–20% overall margin (materials + labor + overhead).
  • Medium Commercial Projects: 20–25% margin to account for complexity, insurance requirements, and bonding.
  • Large Construction Bids: 10–15% margin—bidding volume can be huge, so lower margins on big jobs still generate healthy profits.

Warning: Avoid a “race to the bottom” by undercutting competitors too aggressively. If your margin falls below industry norms, you risk costing yourself money when unexpected issues arise.

Factoring in Permits and Inspections

Know Your Jurisdiction

  • California Example: In Los Angeles County, a plumbing permit might cost $300–$500. Inspections could add $75 per trip (two trips for rough-in and final).
  • Texas Example: In Dallas, permit fees might be $100–$150 with a single inspection included; rural counties can be as low as $50.
  • Local Nuances: Some cities require impact fees or utility connection fees (e.g., in New York City, additional Department of Environmental Protection fees can apply).

Tip: Keep a spreadsheet of permit fees for regions you serve. That way, you can quickly reference and update them without scouring each city’s website for current rates.

Common Mistakes to Avoid When Bidding

Even seasoned plumbers can fall into traps that cost them time and money. Here are pitfalls to watch for:

  1. Underestimating Waste or Breakage
    • Failing to account for scrap, breakage, or extra fittings can quickly balloon material costs.
  2. Ignoring Site-Specific Challenges
    • Hidden obstacles—like obsolete piping or unreinforced concrete floors—can stall the job. Always add a contingency for unknowns.
  3. Skipping the Site Visit
    • Bidding purely from plans or photos invites surprises. Whenever possible, walk the site or schedule a live video walkthrough.
  4. Overlooking Local Code Changes
    • Plumbing codes evolve (e.g., switching from lead-based solder to lead-free in certain jurisdictions). Stay current with code updates.
  5. Applying a One-Size-Fits-All Markup
    • Markups should vary by job complexity and risk. Avoid using a flat percentage for every bid—tailor your margin to the project’s demands.
  6. Badly Written Scope or Terms
    • Leaving out exclusions (e.g., “excludes drywall patching”) can lead to scope creep and client disputes. Spell out every detail.

Tips to Make Your Plumbing Bid Stand Out

Winning a job is about more than just price. Consider these strategies to differentiate your estimate:

  • Detailed Scope of Work: Provide a line-by-line breakdown so clients see the thoughtfulness behind your bid.
  • Clear Visual Aids: Call out where a client might need to see a simple sketch or pricing table. For example, “See Table 1 showing pipe sizes and quantities.”
  • Value-Added Services: Offer to include a free 6-month follow-up inspection or a discount on water-saving fixtures to add perceived value without eroding profit.
  • Flexible Payment Options: Outline installment plans (e.g., 30% deposit, 40% mid-job, 30% on completion) to accommodate budgets.
  • Testimonials or Case Studies: Attach brief examples of similar jobs you’ve completed successfully—“Last month, we re-piped a 3,000 sq ft home in Austin, TX, on time and under budget.”
  • Transparent Warranty: Guarantee your labor for a specified period (e.g., 1-year), and be clear about manufacturer warranties on fixtures.

CTA: Looking to land more jobs? Make sure your bid stands out. Consider offering a bundled service—like a free backflow test with every new water heater installation—so your bid feels like a better deal rather than just a lower price.

Local Considerations and Job Types

Not all plumbing bids are created equal. Location, building type, and job urgency all influence how you structure your estimate.

Regional Pricing Variations

  • California vs. Texas
    • California (e.g., Los Angeles, San Francisco): High cost of living means journeyman rates often exceed $60–$70/hour, and permit fees can be $400+ for residential permits. Material costs for copper and high-end fixtures are also elevated.
    • Texas (e.g., Houston, Dallas): Competitive market with journeyman rates around $40–$50/hour, permit fees as low as $75–$150, and more availability of local plumbing supply warehouses—resulting in lower material costs.
  • Northeast vs. Southeast
    • Northeast (e.g., New York, Boston): Older buildings may have galvanized or cast-iron pipe that requires specialized removal and repiping processes—labor costs increase.
    • Southeast (e.g., Florida, Georgia): Warmer climate means less concern about freezing pipes, but corrosion from salt air can influence pipe choice (use PEX rather than copper in coastal zones).

Residential vs. Commercial Bids

Residential Plumbing Bids

  • Focus on fixtures (tubs, sinks, faucets), domestic water lines, and basic drainage.
  • Typical profit margins: 15–20%.
  • Simpler permit processes but may require homeowner association approvals.
  • Emphasize homeowner experience—cleaning up after the job, leaving no debris, respecting living spaces.

Commercial Plumbing Bids

  • Deal with larger mains, grease traps, backflow preventers, and often code-mandated fire suppressions systems.
  • Higher complexity: multiple inspections (building, health department, fire marshal).
  • Profit margins: 20–25% (or higher if it’s specialized, like medical gas installations in hospitals).
  • Bid forms often require performance bonds, proof of insurance, and detailed project schedules.

Example: A commercial kitchen install in a restaurant will need a grease interceptor and potentially stainless-steel piping—materials and labor are higher-end, and inspections are more frequent, driving up both costs and potential markups.

Emergency and After-Hours Bids

  • Premium Rates: Many plumbing businesses charge 1.5×–2× regular rates for emergency calls (often after 6 PM or on weekends).
  • Minimum Call-Out Fee: Establish a flat minimum (e.g., $200–$300 for a service call) regardless of job size to cover travel and basic labor.
  • Simplified Scope: Emergency bids may need to be verbal or preliminary, with a written follow-up once conditions stabilize. Always confirm in writing before proceeding beyond initial mitigations (like shutting off water).

Scenario: A client calls at midnight because a main line burst under their basement slab. Your initial bid might read:

  • Minimum Service Call (includes first hour) – $250 (flat fee)
  • Additional Labor (beyond first hour) – $75/hr (emergency rate)
  • Materials (shut-off valve + fittings) – $150 approx.
  • Subtotal = $475 (subject to final inspection of full extent of damage)

Bidding a plumbing job effectively requires diligence, clear communication, and a thorough understanding of costs—from pipe fittings and permits to labor rates and profit margins. By following this step-by-step approach, you’ll produce bids that are accurate, professional, and competitive—earning more jobs and reducing costly surprises once work begins. Always stay updated on local permit fees, material price fluctuations, and code changes, and tailor each bid to the specific location and project type. With practice, you’ll build a reputation for reliability, transparency, and fair pricing—positioning your plumbing business for long-term success.

Common Questions About Bidding Plumbing Jobs

Markup depends on your overhead and risk. Most plumbers apply a 15–30% markup on materials and labor combined. For residential jobs in mid-tier markets, 15–20% is common; in high-cost areas or specialized commercial work, 25–30% may be justified.

For clearly defined projects—like “replace water heater”—flat fees provide certainty to clients and limit scope creep. For uncertain or open-ended tasks (e.g., “fix leak, unknown origin”), hourly billing with a not-to-exceed cap can be more appropriate.

Break your bid into phases: rough-in, trim, testing, final. Coordinate with electricians, HVAC techs, and general contractors to avoid redundant work. Clearly state “scope overlaps” and include allowances if other trades delay your schedule.

For small residential jobs, aim to deliver a professional written estimate within 24–48 hours of site visit. For larger commercial bids, 5–7 business days is acceptable, provided you communicate timelines upfront.

Yes, but always issue a formal revised estimate with updated line items, valid dates, and note “Supersedes all prior estimates dated [date].” Communicate changes clearly to avoid confusion.

Want plumbing jobs delivered to your inbox?

Every month, we send you the top plumbing jobs to help you find the best opportunities.
This field is hidden when viewing the form

Next Steps: Sync an Email Add-On

To get the most out of your form, we suggest that you sync this form with an email add-on. To learn more about your email add-on options, visit the following page (https://www.gravityforms.com/the-8-best-email-plugins-for-wordpress-in-2020/). Important: Delete this tip before you publish the form.

Want plumbing jobs delivered to your inbox?